Crushed Limestone Site Prep: The Foundation Your Shed Deserves
Our Crushed Limestone Prep is the perfect entry-level option for ensuring a solid foundation for your shed. Here's what you need to know:
- Ideal Surface: We prepare your site on level sod (up to 8” off-grade) using 4” to 6” of Crushed Limestone (#617 or ¾" nuggets to dust).
- Why Not Blocks?: Due to Northeast Ohio’s freezing and thawing cycles, we don’t recommend placing sheds on blocks—they can shift, compromising stability.
- Precision Matters: Using a laser level and compactor, we ensure the pad is perfectly leveled and firmly packed for long-lasting support.
Accessibility & Additional Services
- Site Access: The site must be accessible by truck and trailer. If not, additional charges may apply for wheelbarrow use.
- Excavation Needs? If your site requires excavation, call us at (330) 482-0078 and email pictures to info@waysidelawnstructures.com. Be sure to include photos of the site with a string and level for reference.
DIY Level Check
To check if your site is level, stretch a string across the area and use a level on it. This simple step ensures you're ready for a proper foundation!
Let us handle the groundwork so your shed stays sturdy and secure for years to come!